Oriane Spring 2019 Work Items
Engine
- Zinc in Heat Exchanger 9/16” nut
- New hose engine seacock to strainer
- New hose strainer to raw water pump
- Reinstall impeller
- Tighten alternator belt
- Check oil level
- Replace hose clamps on intake side
- Clean engine compartment and paint
- Replace heat exchanger brackets
- Investigate leak under engine
- Hot water heat exchanger valves
Electrical
- Check battery level – house last checked 9/28 -0.1 at 3pm
- Check batteries for service life
- Hire marine electrician inspection of boat electronics to analyze and explain electrical system
- MMSI number registration update
- Install solar*
- Install AIS*
Deck
- Re-bed deck fittings identified in survey
- Measure and paint anchor chain
- Measure and mark anchor rode
- Service winches
- Retrieve spinnaker halyard
- Check staysail stay
- Clean and refresh teak deck
- Clean cockpit lockers and rearrange gear
- Repair tv antenna connection
- Reinstall Monitor windvane
- Check/Clean all running rigging
- Inspect standing rigging
-
Remove old name and hailing port - Affix new name and hailing port
Below Decks/Interior
-
Do inventory /
locker diagram - Investigate and Identify head hoses
- Service all seacocks
- Bungs at all seacocks
- Check all hoses
- Check all flares for proper dates
- Clean all bilge areas
- Oil interior teak
- Fill and purge water tanks
- Re-install dodger
- Re-install bimini
-
Fill propane tanks - Reinstall propane tank
- Clean under galley sink
- Clean bilge – inspect hoses and pump
-
Purchaseand install horn for hailer - Replace nav lights with LED’s
- Replace Deck lights with LED’s
- Re-label mast switches
- Cut access panel in quarterberth - (planning started)
Misc.
- Dinghy motor mount
- Move gear to boat