Sunday, March 31, 2019

Oriane Spring 2019 Work Items


Oriane Spring 2019 Work Items

Engine
  •        Zinc in Heat Exchanger 9/16” nut
  •        New hose engine seacock to strainer
  •        New hose strainer to raw water pump
  •        Reinstall impeller
  •        Tighten alternator belt
  •        Check oil level
  •        Replace hose clamps on intake side
  •        Clean engine compartment and paint
  •        Replace heat exchanger brackets
  •        Investigate leak under engine
  •        Hot water heat exchanger valves


Electrical
  •        Check battery level – house last checked 9/28 -0.1 at 3pm
  •        Check batteries for service life
  •        Hire marine electrician inspection of boat electronics to analyze and explain electrical system
  •        MMSI number registration update
  •        Install solar*
  •        Install AIS*

Deck
  •        Re-bed deck fittings identified in survey
  •        Measure and paint anchor chain
  •        Measure and mark anchor rode
  •        Service winches
  •        Retrieve spinnaker halyard
  •        Check staysail stay
  •        Clean and refresh teak deck
  •        Clean cockpit lockers and rearrange gear
  •        Repair tv antenna connection
  •        Reinstall Monitor windvane
  •     Check/Clean all running rigging 
  •     Inspect standing rigging
  •     Remove old name and hailing port 
  •     Affix new name and hailing port

Below Decks/Interior
  •        Do inventory / locker diagram
  •        Investigate and Identify head hoses
  •        Service all seacocks
  •        Bungs at all seacocks
  •        Check all hoses
  •        Check all flares for proper dates
  •        Clean all bilge areas
  •        Oil interior teak
  •        Fill and purge water tanks
  •        Re-install dodger
  •        Re-install bimini
  •        Fill propane tanks
  •        Reinstall propane tank
  •        Clean under galley sink
  •        Clean bilge – inspect hoses and pump
  •        Purchase and install horn for hailer
  •        Replace nav lights with LED’s
  •        Replace Deck lights with LED’s
  •        Re-label mast switches
  •        Cut access panel in quarterberth - (planning started)

Misc.
  •        Dinghy motor mount
  •        Move gear to boat



August Trip Planning

We're starting to plan a summer trip to Nova Scotia.  This is the plan for the first of the four week trip. Overnight to Shelburne or 3 days direct to Halifax depending on weather.